The Foundation Prep Every Arkansas Build Needs
Before the first block is laid or the concrete is poured, every structure needs one thing done right: a solid building pad.
At Pennington Construction & Land Solutions, we specialize in custom building pads that ensure your home, shop, or shed is supported by level, compacted, well-drained ground. We don’t just “eyeball it” — we build with precision, the right materials, and a long-term mindset.
🛠️ What Is a Building Pad, Exactly?:
A building pad is the foundation-level area of ground that’s cleared, leveled, and compacted to support your build. It’s what your foundation rests on.
If it’s not done right, it can lead to:
Cracked concrete
Flooding or drainage issues
Foundation shifting or settling
Failed inspections
Costly rework for contractors
📐 How We Build It Right:
At Pennington, we don’t treat pad work like just another dirt job. Here's our step-by-step process:
1. Site Evaluation-
We assess your land’s slope, soil type, drainage patterns, and elevation to determine the optimal pad location and dimensions.
2. Land Clearing-
We remove trees, roots, brush, and topsoil. Why? Because organic matter breaks down over time — and that leads to sinking.
3. Grading & Shaping-
We rough grade the area, cutting and filling as needed to create a level surface. We also ensure the pad is elevated above surrounding ground to protect from flooding.
4. Compaction-
We compact the subgrade using proper equipment — not just driving over it — to prevent settling. If needed, we bring in select fill or crushed stone for added stability.
5. Final Grade & Drainage Check-
Once compacted, we double-check drainage slope around the pad. Water should flow away from the future structure, not toward it.
🧱 What Can We Build Pads For?:
We prep pads for:
New homes or mobile homes
Shops, barns, and metal buildings
Garages and carports
Storage sheds or accessory buildings
Concrete slabs and patios

📞 Ready to Build on a Solid Foundation?:
Don’t start your project with guesswork. Let’s make sure your pad is done right, from the dirt up.
📞 Call 501‑BE‑BUILT (501‑232‑8458)







Comments